Type of Material: | Thesis |
Title: | Development of a prediction and cost optimisation Mathematical model fremework to optimise maintenance schedule of preventive and predictive maintenance of Mining equipment |
Researcher: | Sharma, Niraj Ranjan |
Guide: | Mishra, A. K. | Sen, P. |
Department: | Department of Mining Engineering |
Publisher: | Indian School of Mines, Dhanbad |
Place: | Dhanbad |
Year: | 2023 |
Language: | English |
Subject: | Predication | Methematical model | Optimise | Mining Equipment | Mining Engineering |
Dissertation/Thesis Note: | PhD; Department of Mining Engineering, Indian School of Mines, Dhanbad, Dhanbad; 2023; 2014DR1176 |
000 | 00000ctm a2200000ua 4500 | |
001 | 446363 | |
003 | IN-AhILN | |
005 | 2023-05-09 15:22:03 | |
008 | __ | 230428t2023||||ii#||||g|m||||||||||eng|| |
035 | __ | |a(IN-AhILN)th_446363 |
040 | __ | |aISMD_826004|dIN-AhILN |
041 | __ | |aeng |
100 | __ | |aSharma, Niraj Ranjan|eResearcher |
110 | __ | |aDepartment of Mining Engineering|bIndian School of Mines, Dhanbad|dDhanbad|ein|0U-0205 |
245 | __ | |aDevelopment of a prediction and cost optimisation Mathematical model fremework to optimise maintenance schedule of preventive and predictive maintenance of Mining equipment |
260 | __ | |aDhanbad|bIndian School of Mines, Dhanbad|c2023 |
502 | __ | |cDepartment of Mining Engineering, Indian School of Mines, Dhanbad, Dhanbad|d2023|o2014DR1176|bPhD |
518 | __ | |d2023-01-30|oDate of Notification |
650 | __ | |aEngineering and Technology|2AIU|aMining Engineering|2UGC |
653 | __ | |aPredication |
653 | __ | |aMethematical model |
653 | __ | |aOptimise |
653 | __ | |aMining Equipment |
700 | __ | |aMishra, A. K.|eGuide |
700 | __ | |aSen, P.|eCo - Guide |
905 | __ | |anotification |
User Feedback Comes Under This section.