| Type of Material: | Thesis |
| Title: | Development of a prediction and cost optimisation Mathematical model fremework to optimise maintenance schedule of preventive and predictive maintenance of Mining equipment |
| Researcher: | Sharma, Niraj Ranjan |
| Guide: | Mishra, A. K. | Sen, P. |
| Department: | Department of Mining Engineering |
| Publisher: | Indian School of Mines, Dhanbad |
| Place: | Dhanbad |
| Year: | 2023 |
| Language: | English |
| Subject: | Predication | Methematical model | Optimise | Mining Equipment | Mining Engineering |
| Dissertation/Thesis Note: | PhD; Department of Mining Engineering, Indian School of Mines, Dhanbad, Dhanbad; 2023; 2014DR1176 |
| 000 | 00000ctm a2200000ua 4500 | |
| 001 | 446363 | |
| 003 | IN-AhILN | |
| 005 | 2023-05-09 15:22:03 | |
| 008 | __ | 230428t2023||||ii#||||g|m||||||||||eng|| |
| 035 | __ | |a(IN-AhILN)th_446363 |
| 040 | __ | |aISMD_826004|dIN-AhILN |
| 041 | __ | |aeng |
| 100 | __ | |aSharma, Niraj Ranjan|eResearcher |
| 110 | __ | |aDepartment of Mining Engineering|bIndian School of Mines, Dhanbad|dDhanbad|ein|0U-0205 |
| 245 | __ | |aDevelopment of a prediction and cost optimisation Mathematical model fremework to optimise maintenance schedule of preventive and predictive maintenance of Mining equipment |
| 260 | __ | |aDhanbad|bIndian School of Mines, Dhanbad|c2023 |
| 502 | __ | |cDepartment of Mining Engineering, Indian School of Mines, Dhanbad, Dhanbad|d2023|o2014DR1176|bPhD |
| 518 | __ | |d2023-01-30|oDate of Notification |
| 650 | __ | |aEngineering and Technology|2AIU|aMining Engineering|2UGC |
| 653 | __ | |aPredication |
| 653 | __ | |aMethematical model |
| 653 | __ | |aOptimise |
| 653 | __ | |aMining Equipment |
| 700 | __ | |aMishra, A. K.|eGuide |
| 700 | __ | |aSen, P.|eCo - Guide |
| 905 | __ | |anotification |
User Feedback Comes Under This section.