Type of Material: | Thesis |
Title: | Certain problems optimisation of pass schedules in rolling |
Researcher: | Balkrishnan, D |
Guide: | Chaturvedi, R C |
Department: | Department of Mechanical Engineering |
Publisher: | Indian Institute of Technology-Bombay |
Place: | Mumbai |
Year: | 1978 |
Language: | English |
Subject: | Technology | Metal Manufacture | Mechanical engineering |
Dissertation/Thesis Note: | PhD |
000 | 00000ntm a2200000ua 4500 | |
001 | 19652 | |
003 | IN-AhILN | |
005 | 2011-01-13 00:00:00 | |
008 | __ | 781231t1978||||ii#||||g|m||||||||||eng|| |
035 | __ | |a(IN-AhILN)th_19652 |
040 | __ | |aIITB_400076|dIN-AhILN |
041 | __ | |aeng |
100 | __ | |aBalkrishnan, D|eResearcher |
110 | __ | |aDepartment of Mechanical Engineering|bIndian Institute of Technology-Bombay|dMumbai|eIn |
245 | __ | |aCertain problems optimisation of pass schedules in rolling |
260 | __ | |aMumbai|bIndian Institute of Technology-Bombay|c1978 |
502 | __ | |bPhD |
650 | __ | |aMechanical engineering|2UGC |
653 | __ | |aTechnology |
653 | __ | |aMetal Manufacture |
700 | __ | |aChaturvedi, R C|eGuide |
905 | __ | |anotification |
User Feedback Comes Under This section.