Type of Material: | Thesis |
Title: | Analysis of material requirements and production scheduling in amultistage production system |
Researcher: | Sikarwar, Rajendra Singh |
Guide: | Sadiwala, C M |
Department: | Department of Mechanical Engineering |
Publisher: | Barkatullah Vishwavidyalaya |
Place: | Bhopal |
Year: | 2000 |
Language: | English |
Subject: | Engineering Science | Mechanical Engineering | Mechanical engineering |
Dissertation/Thesis Note: | PhD |
000 | 00000ntm a2200000ua 4500 | |
001 | 114859 | |
003 | IN-AhILN | |
005 | 2011-01-13 00:00:00 | |
008 | __ | 001231t2000||||ii#||||g|m||||||||||eng|| |
035 | __ | |a(IN-AhILN)th_114859 |
040 | __ | |aBRKT_462026|dIN-AhILN |
041 | __ | |aeng |
100 | __ | |aSikarwar, Rajendra Singh|eResearcher |
110 | __ | |aDepartment of Mechanical Engineering|bBarkatullah Vishwavidyalaya|dBhopal|eIN |
245 | __ | |aAnalysis of material requirements and production scheduling in amultistage production system |
260 | __ | |aBhopal|bBarkatullah Vishwavidyalaya|c2000 |
502 | __ | |bPhD |
650 | __ | |aMechanical engineering|2UGC |
653 | __ | |aEngineering Science |
653 | __ | |aMechanical Engineering |
700 | __ | |aSadiwala, C M|eGuide |
905 | __ | |anotification |
User Feedback Comes Under This section.